IMAG0096.jpg

Wilkus Architects is partnering with engineering firm Bolton and Menk on the City of Mankato Wastewater Treatment Facility clarifier improvement project.  The project consists of 2 new primary, and 2 new secondary clarifiers and supporting infrastructure for both.  Today we are on-site to inspect the progress of the new clarifier structures, and more importantly, observe the inspection of a new precast roof structure over an existing pump room that supports the primary clarifiers.  This roof will have to be waterproofed and Wilkus has hired Inspec, Inc., a professional waterproofing consultant, to assist in the proper installation. Check out the images below from our site visit!

IMAG0096 IMAG0097 IMAG0098 IMAG0099 IMAG0100 IMAG0101 IMAG0102 IMAG0103

Comment